Loading…
arrow_back View All Dates
Wednesday, September 16
 

7:00am MDT

Registration
Wednesday September 16, 2026 7:00am - 3:30pm MDT
Nametags will be required for all Conference events.
Sponsors
avatar for City of Regina

City of Regina

City of Regina

avatar for EPCOR

EPCOR

EPCOR

Wednesday September 16, 2026 7:00am - 3:30pm MDT
2nd Floor Prefunction Delta Hotel

7:00am MDT

Quiet Lounge
Wednesday September 16, 2026 7:00am - 4:30pm MDT
Quiet Lounge is open all week for all attendees to promote your conference wellness.
Sponsors
avatar for Hamm Construction

Hamm Construction

Hamm Construction
Wednesday September 16, 2026 7:00am - 4:30pm MDT
Milan Delta Hotel

8:30am MDT

First Timers Welcome Reception
Wednesday September 16, 2026 8:30am - 10:00am MDT
Learn about WCW and how to get the most of your Conference experience.
Wednesday September 16, 2026 8:30am - 10:00am MDT
Verdi 1st Floor, Delta Hotel

10:00am MDT

Exhibition Coffee Social
Wednesday September 16, 2026 10:00am - 11:00am MDT
Coffee and light breakfast in the Exhibition.
Sponsors
avatar for Hamm Construction

Hamm Construction

Hamm Construction
avatar for SaskWater

SaskWater

SaskWater

avatar for Westridge Construction Ltd

Westridge Construction Ltd

Westridge Construction Ltd

Wednesday September 16, 2026 10:00am - 11:00am MDT
Ballroom, 2nd Floor Delta Hotel

10:00am MDT

Exhibition
Wednesday September 16, 2026 10:00am - 1:30pm MDT
Coffee Social and Lunch will be served with the Exhibition.
Wednesday September 16, 2026 10:00am - 1:30pm MDT
Ballroom, 2nd Floor Delta Hotel

11:00am MDT

Best of the West Taste Test
Wednesday September 16, 2026 11:00am - 12:00pm MDT
WCS AWWA will hold the Best of the West Water Taste Test at WCW25, inviting AWWA Utility Members to participate. The winning utility will compete in the Best of the Best Taste Test at AWWA’s Annual Conference next year in Washington D.C;
This competition celebrates the important work our utility members do everyday to deliver safe, high quality drinking water to their customers.
Sponsors
avatar for ISL

ISL

ISL Engineering
At ISL, we share an enthusiasm for community infrastructure.

From planning through to design and construction management, we create nimble teams to tackle the unique requirements of every project.

Our technical knowledge encompasses transportation, land use planning, civil engine... Read More →
Wednesday September 16, 2026 11:00am - 12:00pm MDT
Campania A Delta Hotel

11:30am MDT

Exhibition Lunch
Wednesday September 16, 2026 11:30am - 12:30pm MDT
Lunch & Learn with our Exhibitors. Lunch will feature different hot food stations and are complimentary with your conference registration.
Sponsors
avatar for AWI

AWI

AWI
AWI Filter
avatar for ClearTech

ClearTech

Booth 103, ClearTech
ClearTech is a leading industrial chemical manufacturer and distributor of chemicals, chemical feed equipment, weighing systems, analytical instrumentation, and laboratory products for municipal, commercial and industrial uses. Across Canada we deliver quality chemicals and equipment... Read More →
avatar for Nexom

Nexom

Nexom

Wednesday September 16, 2026 11:30am - 12:30pm MDT
Ballroom, 2nd Floor Delta Hotel

1:00pm MDT

WCS AWWA Board Meeting
Wednesday September 16, 2026 1:00pm - 4:00pm MDT
Wednesday September 16, 2026 1:00pm - 4:00pm MDT
Piero Delta Hotel

1:30pm MDT

Enhanced Porosity and Adsorption Capacity in Wood-Based Activated Carbon: A Comparative Study of Pre-treatment Efficacy
Wednesday September 16, 2026 1:30pm - 2:00pm MDT
Activated carbon (AC) is often regarded as the most-used adsorbent in water treatment. Its wide use is due to the material’s extensive internal pore network that provides a high specific surface area and adsorption capacity. With pore sizes ranging from under 2 nm to over 50 nm, AC adsorbs contaminants of diverse molecular sizes. However, once saturated, the media must be regenerated or replaced. This requirement poses a significant logistical barrier for remote communities, where the cost and difficulty of transporting fresh AC often limits its use. 
This presentation covers a potential sustainable solution: manufacturing AC from white spruce wood, a common waste material in remote Canadian regions. The study evaluates the feasibility of phosphoric acid activation and investigates how three distinct wood pre-treatments (torrefaction, hydrothermal and alkaline) influence the resulting surface area, pore size distribution, and adsorption capacity. To understand the mechanism by which porosity is introduced in the resultant AC, the physical, chemical, and crystalline properties of the wood were characterized both before and after pre-treatment. These findings were further supported by analyzing off-gases produced during the carbonization process. 
The results indicate that all three pre-treatments yielded AC with higher surface areas and adsorption capacities (Iodine Numbers) competitive with commercially produced AC. These improvements were broadly driven by the removal and decomposition of amorphous biopolymers, which increased volatilization during carbonization, leading to larger average pore diameters. 
Most notably, the study hypothesizes that differences in pore size distribution are primarily governed by the mean size of cellulose crystallites in the wood. A shift in the dominant pore-development mechanism was observed based on this crystalline property: larger crystallites tend to facilitate the formation of larger pores. This effect was most significant in alkaline pre-treated samples, which showed the g
Speakers
avatar for Kieran Lobo

Kieran Lobo

Staff Professional, Carollo Engineers Canada Ltd.
Kieran plays a key role in industrial wastewater, potable water, and domestic wastewater treatment facility construction projects across Canada and the US. These projects span a range of scales and complexities, and include pumping systems, conventional water treatment processes... Read More →
Wednesday September 16, 2026 1:30pm - 2:00pm MDT
Novara 1st Floor, Delta Hotel

1:30pm MDT

Stormwater Reuse and Wetland Retention - Industrial Development Case Study
Wednesday September 16, 2026 1:30pm - 2:00pm MDT
A railyard and logistics centre Staged Master Drainage Plan (SMDP) outlines the stormwater management strategy for a 536‑hectare industrial development in southern Alberta. Prepared to meet strict local authority guidelines in a closed basin, the plan aims to manage post‑development runoff, protect retained Crown‑claimed wetlands, and integrate local and regional drainage infrastructure. The SMDP emphasizes adaptive management and long‑term monitoring to address uncertainties in groundwater–wetland interactions and ensure ongoing regulatory and environmental compliance.
The site consists primarily of cultivated land with flat topography and numerous wetlands. Geotechnical and groundwater investigations identified variable till layers and shallow bedrock, with groundwater generally flowing toward wetlands and exhibiting seasonal fluctuations. These conditions informed the drainage design and wetland protection approach.
Stormwater management is centered on nine wet stormwater management facilities (SWMFs) designed to provide sediment control and water quality treatment, exceeding the local authority requirement for 85% total suspended solids removal. Several facilities are positioned to support wetland hydrology and include provisions for direct pumping where required. A regional stormwater trunk system conveys controlled outflows to an open channel and is sized to accommodate both onsite and upstream catchments.
Development is planned in six phases, with each phase extending the trunk system and constructing associated infrastructure. Due to the absence of feasible overland emergency spill routes, the trunk system is designed with increased capacity to manage extreme storm events.
Hydrologic modeling using PCSWMM shows reduced infiltration and groundwater recharge and increased surface runoff following development. To mitigate impacts on wetland hydroperiods, adaptive management measures are recommended, including seasonal or year‑round pumping and potential supplemental groundwater baseflow.
Speakers
NC

Neal Cody

Water Resources Engineer, Stantec

Wednesday September 16, 2026 1:30pm - 2:00pm MDT
Campania A/B 2nf Floor, Delta Hotel
  Stormwater
  • global Y

1:30pm MDT

Seeing Inside the Siphon: Screening a Triple Barrel Wastewater System Using INGU Pipers®, City of Lethbridge Case Study
Wednesday September 16, 2026 1:30pm - 2:00pm MDT
Wastewater siphons represent some of the most difficult municipal assets to assess due to complex hydraulics, limited access, and operational constraints that restrict traditional inspection methods. This presentation examines the application of free-swimming multi-sensor inspection technology (INGU Pipers®) as a rapid screening tool for evaluating the condition and performance of large, multi-barrel wastewater siphons, using the City of Lethbridge triple barrel siphon as a detailed case study.
The Lethbridge system consists of multiple asbestos cement barrels operating under gravity-driven and pressurized conditions. Screening was conducted to establish a baseline understanding of system integrity, identify hydraulic inefficiencies, and inform future maintenance and high-resolution condition assessment planning. The inspection collected hydraulic grade line data, acoustic leak detection, air pocket identification, and indicators of internal restrictions while the system remained fully operational.
Results confirmed no active leaks within tool sensitivity, while identifying localized air accumulation and segments exhibiting elevated hydraulic losses consistent with internal deposition and reduced conveyance efficiency. Screening data supported targeted recommendations including progressive pigging to restore hydraulic performance and follow-up structural assessment to better understand long-term asset integrity.
This case study demonstrates how minimally invasive screening enables utilities to evaluate complex siphon infrastructure quickly, reduce uncertainty, and make defensible decisions regarding maintenance and capital planning. Attendees will gain practical insight into deployment strategies, data interpretation, and how screening technologies can support phased, risk-based condition assessment programs for critical wastewater siphons.
Speakers
avatar for Kelsey Schellenberg

Kelsey Schellenberg

Service Consultant, SFE Global
Wednesday September 16, 2026 1:30pm - 2:00pm MDT
Verdi 1st Floor, Delta Hotel

2:00pm MDT

Backwash Pressure: The Silent Filter Killer
Wednesday September 16, 2026 2:00pm - 2:30pm MDT
Granular media filters are at the heart of many water treatment plants and often the final barrier for particle removal. Although water treatment plants may vary in size and complexity, all granular media filters require backwash to recover the filter media after producing a batch of water. Filter Operators typically monitor and trend filter effluent quality and filter capacity. These two items are used by the Operator to determine if a filter is working well or not. To ensure efficient, sustained filter performance a third item should be added. The third item is monitoring and trending the backwash pressure. Unchecked, the backwash pressure across the filter can increase until the filter underdrain system becomes over-pressured and eventually fails. Even with a substantially plugged filter underdrain, the filter effluent quality and filter capacity may remain acceptable. Acceptable, until the filter underdrain fails! While a UFRV decrease or a filter effluent turbidity spike are readily noticeable, gradually increasing backwash pressure is silent.


Speakers
BH

Brett Hambley

Technical Services Technician, AWI - Anthratech Western Inc

Wednesday September 16, 2026 2:00pm - 2:30pm MDT
Novara 1st Floor, Delta Hotel

2:00pm MDT

Concept to Construction: Lauderdale Dry Pond
Wednesday September 16, 2026 2:00pm - 2:30pm MDT
The Lauderdale neighbourhood in Edmonton ranked as one of the higher priority flood risk neighbourhoods in EPCOR’s SIRP basin ranking system. The neighbourhood is partially separated with some dedicated storm sewers, but also portions of combined sewers with lower level of service that tend to exhibit drainage issues during intense rainfall. Stantec Consulting was retained by EPCOR to implement a flood mitigation dry pond and storm sewer upgrades in the neighbourhood to reduce the flood risk and improve the level of service for the drainage system. Starting as a concept design evaluation, the project continued through to a design phase and now implementation with construction starting in late 2025. Some unique challenges arose during the project including the assessment of a complex drainage network using a 2D hydraulic model, special design considerations for implementing a stormwater management facility in Edmonton’s largest fully fenced off-leash dog park, and a portion of dual-micro tunneling for deep sanitary and storm sewer installation. This presentation will showcase the unique challenges, creative solutions and lessons learned of this complex drainage upgrade in a sensitive area.
Speakers
DB

David Burton

Water Resources Engineer, Stantec Consulting
David is a water resources engineer at Stantec's head office in Edmonton. He has 14 years of experience in urban drainage planning and design for urban flood mitigation infrastructure. Currently he acts as the Urban Water Resources Engineering Disciple Lead for Western Canada.
Wednesday September 16, 2026 2:00pm - 2:30pm MDT
Campania A/B 2nf Floor, Delta Hotel

2:00pm MDT

Using Real-time Wastewater Quality Monitoring to Automate and Improve Onsite Industrial Wastewater Treatment
Wednesday September 16, 2026 2:00pm - 2:30pm MDT
In Winnipeg, Manitoba, industries discharging industrial wastewater to the municipal collection system are required to meet wastewater quality limits set forth by the City’s Sewer By-law No. 106/2018. Given the strict discharge limits for biological oxygen demand (BOD), total suspended solids (TSS), pH, and fats, oils and grease (FOGs), many industries utilize onsite wastewater treatment systems to reduce these parameters prior to discharging their wastewater to avoid costly surcharges. However, for industries that produce a variety of different products, such as large-scale food processing facilities, the resulting wastewater quality can be highly variable making it difficult for onsite wastewater treatment systems to maintain optimal treatment conditions, such as coagulant dose. Therefore, industries are burdened with needing to continually monitor and manually adjust their onsite wastewater treatment system in order to minimize the discharge of overstrength wastewater and avoid surcharges. Given that most industries do not have dedicated wastewater treatment system operators, the onsite wastewater system often goes unattended and operates outside of the optimal treatment conditions, particularly when the industry produces highly variable wastewater quality.
To better control their onsite wastewater treatment system, a large-scale food processing facility installed a real-time monitoring system (i.e., an S::CAN Monitoring Station) to continually measure water quality prior to and following the onsite dissolved air flotation (DAF) system and automatically adjust coagulant and polymer dosing to meet treated water targets. The S::CAN system consisted of two (2) online UV-Vis spectrophotometers that would measure BOD, TSS, and FOGs as well as ORP and pH meters to monitor pre and post-treated water quality. Initially, the pre and post-treated water quality was monitored for approximately 3 months to evaluate the variability in the incoming wastewater quality and to identify periods where the production of a particular food product resulted in wastewater that was difficult to treat using DAF at the set coagulant and polymer dose. For production periods identified as producing wastewater that was particularly challenging for the DAF to treat, jar-testing was used to determine the optimal coagulant and polymer dose. Following the initial evaluation and optimization period, the wastewater quality data and optimal chemical dose ranges were used to develop and refine feedback logic used to control the chemical delivery system.
Overall, the implementation of the real-time S::CAN monitoring and automated dosing control system enabled the facility to transition from reactive, manual process adjustments to a proactive, data-driven treatment approach. By continuously characterizing influent variability and linking water quality measurements to optimized coagulant and polymer dosing strategies, the facility improved the stability and performance of its DAF system despite highly variable production schedules. The project demonstrates that integrating real-time monitoring with adaptive control logic can significantly enhance onsite industrial wastewater treatment reliability, particularly for food processing facilities with fluctuating wastewater characteristics.
Speakers
SS

Steven Simpson

Head of Projects and Solutions, Aquatic Life Ltd,
Steven Simpson is Head of Projects and Solutions at Aquatic Life, where he has been a key member of the team since 2011. He holds a Bachelor of Sciences in Mechanical Engineering from the University of Manitoba and has dedicated his career to advancing practical water monitoring solutions... Read More →
avatar for Juan Diaz Salazar

Juan Diaz Salazar

Staff Professional, Carollo Engineers Canada Ltd.
Juan Diaz Salazar is an Engineering Intern at Carollo Engineers and a PhD Candidate in water treatment in the department of Civil Engineering at the University of Manitoba, specializing in drinking water treatment, membrane filtration, and fouling. Juan holds a BSc in Biotechnology... Read More →
Wednesday September 16, 2026 2:00pm - 2:30pm MDT
Verdi 1st Floor, Delta Hotel

2:30pm MDT

From Failure to Insight: How Structured Membrane Autopsies Improve Treatment Performance and Asset Longevity
Wednesday September 16, 2026 2:30pm - 3:00pm MDT
Membrane failures in water and wastewater treatment systems often appear sudden, yet they typically result from progressive and detectable mechanisms. This presentation shares practical insights from conducting comprehensive membrane autopsies designed to uncover the root causes of performance decline. Using standardized procedures and analytical protocols, the work evaluates fouling layers, chemical deposits, structural damage, and operational histories to build a clear diagnostic profile for each membrane element. The results consistently reveal multi‑factor interactions—such as feedwater variability, pretreatment gaps, cleaning inefficiencies, and operational stress—that drive premature failure. By translating autopsy findings into actionable recommendations, utilities have achieved measurable improvements in flux recovery, cleaning effectiveness, and membrane lifespan. Attendees will gain a deeper understanding of how autopsy‑driven decision‑making strengthens asset management, reduces unplanned downtime, and supports more resilient treatment operations.
Speakers
EZ

Enisa Zanacic

Integrated Water Systems Inc (IWS)

Wednesday September 16, 2026 2:30pm - 3:00pm MDT
Novara 1st Floor, Delta Hotel

2:30pm MDT

Gasification Projects, Pitfalls, bear traps, dust devils and opportunities
Wednesday September 16, 2026 2:30pm - 3:00pm MDT
Insights from a quarter of century of gasification projects experience. This will be primarily focussed on biosolids and other sludges but will refer to other waste types.
 
Biosolids challenges will be reviewed briefly and then a step by step look at the critical stages of process and building a project including:
  • Feedstock characteristics, project planning and plant integration.
  • Importance of dewatering, drying and achieving thermal balance.
  • Gasification and pyrolysis design types.
  • Addressing emissions and contaminants, e.g. PFAS.
  • Understanding project financial feasibility: Products, markets and revenue.
  • A brief look at IQ Energy Technology Development and an update on our 12 dry tonnes per day gasification plant that is operational in Canada.
 
The object of the session is to look broadly at possible projects and what to be looking for and questions to ask, where the pitfalls and opportunities are from our developers 25+ years of project experience.
 
Speakers
CF

Charles Foster

IQ Energy Inc.

Wednesday September 16, 2026 2:30pm - 3:00pm MDT
Campania A/B 2nf Floor, Delta Hotel

3:00pm MDT

Break
Wednesday September 16, 2026 3:00pm - 3:30pm MDT
Time to hydrate and meet someone new!
Wednesday September 16, 2026 3:00pm - 3:30pm MDT
2nd Floor Prefunction Delta Hotel

3:30pm MDT

Comparing Approaches to RO/NF Permeate Stability
Wednesday September 16, 2026 3:30pm - 4:00pm MDT

Reverse osmosis and nanofiltration (RO/NF) is widely recognized as one of the most effective processes for removing problematic water constituents from drinking water. However, the non-selective nature of RO/NF membranes also strips beneficial ions and CO₂ buffering capacity, resulting in permeate with low pH, and indices inferring relatively unstable water in the distribution system.
To produce stable finished water, RO/NF post-treatment stabilization/remineralization is beneficial. Common industry approaches include bypass streams, chemical dosing, and calcite/limestone contactors, each presenting distinct trade-offs in capital investment, operational complexity, maintenance requirements, and long-term consumable costs.
This presentation compares these stabilization strategies using real-world performance data from multiple full-scale RO/NF facilities. Key metrics evaluated include achievable index and pH targets, alkalinity and hardness remineralization, chemical and consumable costs, and operator involvement over years of operation.
Findings highlight which approaches deliver the best balance of water quality, reliability, and cost for different plant sizes and source-water conditions, providing actionable guidance for designers and operators seeking to optimize RO/NF post-treatment systems.

Speakers
avatar for Tyler Reaser

Tyler Reaser

Sales Engineer, E.I.T, Delco Water
Tyler Reaser graduated from the University of Saskatcewan in 2021 with a Bachelor of Science in Mechanical Engineering. Tyler began work with Delco Water as a field services engineer where he specialized in system startup and commissioning, service and maintenance, and troubleshooting... Read More →
Wednesday September 16, 2026 3:30pm - 4:00pm MDT
Novara 1st Floor, Delta Hotel

3:30pm MDT

Integrating Stormwater Reuse for Irrigation and Wetland Replenishment in a closed basin – A residential development Case Study
Wednesday September 16, 2026 3:30pm - 4:00pm MDT
Urban stormwater management is increasingly required to balance flood mitigation, water quality improvement, and sustainable water use. The Cornerstone Phase 1 Storm Pond P project in northeast Calgary demonstrates how stormwater reuse can be integrated into conventional wet pond design to support both landscape irrigation and wetland replenishment while meeting stringent regulatory discharge and water quality objectives.
Storm Pond P services a 153.9 ha mixed residential and commercial catchment and was designed as a permanent wet pond with offline sediment chambers to achieve sediment removal targets exceeding 85% for particles ≥50 µm prior to discharge to Nose Creek. In addition to quantity and quality control, the system incorporates active reuse of stored stormwater to offset potable water demand and support downstream aquatic features. 
Stormwater reuse for irrigation is achieved through controlled pumping from the pond’s permanent storage zone between defined lower and upper normal water levels. Reclaimed water is used to irrigate approximately 15.3 ha of parks, sports fields, school sites, and landscaped open spaces, with irrigation demand and withdrawal rates governed by evapotranspiration, soil infiltration capacity, and seasonal operating rules. The reuse system is explicitly modeled within a continuous PCSWMM framework to evaluate long-term water balance performance and ensure compliance with watershed runoff volume targets.
In parallel, stormwater is reused to replenish an adjacent constructed wetland (Wetland Q), providing ecological support and additional volume management benefits. Automated control rules regulate pumping based on pond water levels and seasonal conditions, ensuring wetland replenishment without compromising flood storage capacity.
This case study illustrates how storm ponds can function as multi-purpose water infrastructure, integrating stormwater reuse, irrigation efficiency, and wetland sustainability into urban drainage systems. The approach offers a transferable framework for municipalities seeking resilient, climate-adaptive stormwater solutions that extend beyond traditional conveyance and detention objectives.
Speakers
NA

Nadir Abdalla

Stantec Consulting Ltd

Wednesday September 16, 2026 3:30pm - 4:00pm MDT
Campania A/B 2nf Floor, Delta Hotel

3:30pm MDT

Integrated Condition Assessment of PVC Wastewater Forcemains: Inspection, Monitoring, and Fatigue Analysis for Risk-Based Decision-Making
Wednesday September 16, 2026 3:30pm - 4:00pm MDT
Leduc County completed a comprehensive condition assessment of the New Sarepta Forcemain and the LS‑1 Forcemain to support proactive asset management and risk‑based decision‑making for critical wastewater infrastructure. The New Sarepta Forcemain is a 200‑millimetre PVC pipeline owned and operated by Leduc County and serves as a vital component of the regional wastewater system. The LS‑1 Forcemain is a 300‑millimetre PVC pipeline owned by Edmonton International Airport and operated by Leduc County, where reliable wastewater conveyance and early leak detection are critical to airport operations and environmental protection.
The assessment incorporated acoustic leak and gas pocket detection, transient pressure monitoring, hydrogen sulfide (H₂S) monitoring, and fatigue analysis of the PVC pipelines. This integrated methodology enabled a robust evaluation of key operational risks, including leakage, entrapped air, pressure surges, corrosive environments, and long‑term material fatigue.
The findings demonstrated that comprehensive condition assessments significantly enhance confidence in pipeline condition, support lifecycle planning, and inform risk‑based maintenance and capital investment strategies. This case study underscores the value of integrated assessment approaches in improving system resilience and reliability, capturing lessons learned, identifying opportunities for future enhancement, and supporting the long‑term management of critical wastewater assets.
 
Speakers
avatar for Javed Mukri

Javed Mukri

Business Development Manager, Pure Technologies Ltd
Electromagnetic Condition Assessment of the 750‑mm 4th Avenue Primary Water Main
Wednesday September 16, 2026 3:30pm - 4:00pm MDT
Verdi 1st Floor, Delta Hotel

4:00pm MDT

Practical Pathways to Improve Legacy Slow Sand Filtration Systems
Wednesday September 16, 2026 4:00pm - 4:30pm MDT
Many small and remote communities across Canada, including numerous First Nations, rely on legacy slow sand filtration systems that are structurally sound but strained by changing source water conditions, maintenance needs, and community growth. This presentation examines practical upgrade strategies that support the continued use of these facilities while improving system capacity, resilience, and operational efficiency.


Focusing on the intersection of established natural treatment processes and adaptable modern technologies, this session will highlight how enhancements such as pre-ozonation, roughing filtration, and surface-wash retrofits can improve biological performance, stabilize operations, and eliminate the need for sand replacement.


Case studies from MS Filter projects across Canada will feature observed performance outcomes, implications for long-term maintenance, and benefits for communities seeking to optimize existing infrastructure without the expense of full system replacement. Slow sand systems are sound, robust and sustainable. With customized upgrades, these systems will stand the test of time.
Speakers
avatar for Kristof Karpiuk

Kristof Karpiuk

Director of Business Development, MS Filter Systems Inc.
Kristof Karpiuk, P.Eng. is Director of Operations at MS Filter Systems, specializing in the deployment and commissioning of enhanced slow-sand filtration systems for small municipalities and Indigenous communities. A graduate of Carleton University’s Civil Engineering program, he leads field implementation... Read More →
Wednesday September 16, 2026 4:00pm - 4:30pm MDT
Novara 1st Floor, Delta Hotel

4:00pm MDT

Safety Improvements at Existing Stormwater Management Facility Wet Ponds
Wednesday September 16, 2026 4:00pm - 4:30pm MDT
EPCOR Water Services owns and operates over 240 stormwater management facilities in the City of Edmonton and has been undertaking various initiatives to improve the safety of these facilities - in particular wet ponds. In 2017, EPCOR completed an initial safety review which included a jurisdictional review of existing SWMF safety practices, an assessment of gaps between EPCOR's SWMF safety standards and those of other jurisdictions, and identification of improvements to EPCOR SWMF standards. In 2019, Stantec conducted field inspections of all of EPCOR's wet ponds and completed risk assessments and identification of safety deficiencies to prioritize which sites required immediate attention. Since this field program, EPCOR has continued to refine their risk assessments of these facilities and has commenced design and construction efforts with Stantec on 10 wet ponds throughout Edmonton.  
A challenging aspect of wet pond safety is balancing the need for access to the pond for maintenance/inspections, visibility around the shoreline, and barriers for public access (which often inhibit maintenance access & visibility). EPCOR and Stantec have been developing a vegetative barrier approach using plant species that complement the existing vegetation, provide deterrents to for public access, and include view-corridors for maintenance and operations purposes. Surveys were used to collect resident feedback on a variety of topics including existing use of the space around the wet ponds, proposed plant species, and reiterating the importance of safety around these stormwater facilities. 
This presentation will share the story of assessment, risk identification, public consultation, and design & construction efforts which were undertaken (and continue to be pursued) to improve safety at EPCOR's wet ponds. 
Speakers
avatar for Sara Kardash

Sara Kardash

Water Resource Engineer, Stantec Consulting Ltd.
Sara is a Water Resource Engineer from Edmonton, AB, who works on stormwater improvement projects including dry ponds, wet pond safety, outfall rehabilitation, and low impact development.
Wednesday September 16, 2026 4:00pm - 4:30pm MDT
Campania A/B 2nf Floor, Delta Hotel

4:00pm MDT

Smell Ya Later
Wednesday September 16, 2026 4:00pm - 4:30pm MDT
To address persistent odour concerns at the discharge of the City of Saskatoon Jasper Avenue Lift Station, an Oxygen Injection System was installed to proactively reduce hydrogen sulfide (H₂S) formation within the force main. The system uses pressure swing absorption to concentrates oxygen on site from atmospheric air and injects the oxygen into the wastewater stream, maintaining aerobic conditions and preventing the biological generation of H₂S as the wastewater is pumped through the discharge forcemain.
Since commissioning, the system has achieved over a 90% reduction in H₂S concentrations at the downstream manhole. This significant decrease has improved odour control, reduced corrosion potential within the collection system, and enhanced overall system performance without the need for chemical addition.
The installation demonstrates an effective, sustainable approach to odour management through in-line oxygenation and proactive sulfide prevention.
Speakers
avatar for Mitchel Knaus

Mitchel Knaus

Wastewater Systems Engineer, City Of Saskatoon
Mitchel Knaus is dedicated Professional Engineer with over 8 years experience in the operations and maintenance of a class 4 treatment facility. He is currently a Wastewater Systems Engineer at the Saskatoon WWTP. During his time Mitchel has been involved in many capital projects... Read More →
Wednesday September 16, 2026 4:00pm - 4:30pm MDT
Verdi 1st Floor, Delta Hotel

4:30pm MDT

WOW - Women of Water Networking
Wednesday September 16, 2026 4:30pm - 6:30pm MDT
This event is designed to connect, empower, and support women working in our water industry, providing a platform for sharing experiences, building professional relationships, and promoting gender diversity within the field.
Sponsors
avatar for Kyla Kirk

Kyla Kirk

Jacobs
Wednesday September 16, 2026 4:30pm - 6:30pm MDT
Indigo Dining room Delta Hotel
 
  • Filter By Date
  • Filter By Room
  • Filter By Type
  • Timezone


Share Modal

Share this link via

Or copy link

Filter sessions
Apply filters to sessions.
Filtered by Date -