Thursday September 17, 2026 3:30pm - 4:00pm MDT
In 2022, the Town of Lumsden replaced its aging lagoon system with a modern Class 3 mechanical wastewater treatment facility, demonstrating how innovative design and strategic planning can deliver sustainable, cost‑effective infrastructure within tight regulatory and financial constraints. Designed to serve 2,500 residents in Stage 1 and 3,700 in Stage 2, the new plant provides a scalable treatment solution tailored for growing small communities seeking enhanced environmental protection.
 
The project included construction of a new main lift station, headworks building, process building, and a community‑focused odor control strategy. The liquid treatment train incorporates screening, grit removal, two sequencing batch reactors (SBRs), and UV disinfection. Solids management systems include sludge pumping and storage, rotary drum thickening, dual aerobic/anoxic digesters, centrifuge dewatering, and dedicated biosolids storage. Chemical treatment, aluminum sulfate for phosphorus removal, polymer for thickening and dewatering, and sodium carbonate for alkalinity, supports reliable, optimized performance. Since commissioning, the facility has consistently met all provincial effluent requirements, including CBOD₅, TSS, ammonia, E. coli, total nitrogen, phosphorus, and acute lethality parameters.
 
This presentation will walk through the project lifecycle, from planning and design through construction and commissioning, highlighting key challenges, lessons learned, and successes. The Lumsden WWTP showcases Stantec’s modular approach to capacity planning, with an initial two‑basin SBR system that meets current needs while streamlining future expansion for a growing community.
Speakers
avatar for Alex Munoz

Alex Munoz

Senior Process Engineer, Stantec Consulting Ltd.
Alex is a Senior Process Engineer with Stantec in Canada. He has played key roles in the design of several major wastewater treatment plant (WWTP) upgrades, including projects in Calgary, Regina, Moose Jaw, Midhurst, and Lumsden. He has also contributed to engineering and construction... Read More →
TW

Tylor Wood

Wastewater Treatment Lead, Town of Lumsden
Tylor has an Environmental Engineering degree from the University of Regina. He leads the operations of the wastewater collection and treatment systems in the Town of Lumsden, where a new Class 3 treatment facility was commissioned in 2020.
Thursday September 17, 2026 3:30pm - 4:00pm MDT
Lombardy 2nf Floor, Delta Hotel

Sign up or log in to save this to your schedule, view media, leave feedback and see who's attending!

Share Modal

Share this link via

Or copy link